Problem
The wall of the pantry is a disaster.
Goals
- Get all of the electrical systems up to modern code
- Make it easy to switch from line to generator and back
- Make it look nice
The Plan
Run 40' of 4" x 6" cable trays along the steel U-channel in the basement to the center of the lodge. There, join up with a new 200A Square D PON load center. Move a bunch of the loads out of the pantry load center into the basement subpanel. Then clean up that pantry wall.
- Pantry
- load center: 200A ____ type __
- feeder:
- ground:
- Basement
- load center: 200A
- feeder: AWG 3/0 copper wire, 60' x (3) strands
- ground: AWG #\8 copper ground wire, 60'
Stuff to move onto new panel
- 240V
- (2) electric heaters
- (2) electric water heaters
- (1) electric water heater (small)
- (1) booster pump
- 120V
- TODO
Prereqs
- move first aid room sprinkler
- move first aid room night light
- buy only a few combo AFCI/GFCI and verify they work well with generator
Shopping List
- 40' of 4x6" cable tray
- 180' of AWG 3/0 copper wire
- 60' of AWG #\8 bare copper wire
- 200A Square D PON Load Center
- (4) 240V, 20A
- (3) 240V, 30A, GE
- (5) 120V, 20A AFCI/GFCI
- (5) 120V, 15A AFCI/GFCI